Portable Garage convert
Posted: Tue Feb 07, 2017 6:12 pm
Hello everyone.
Here is a story in pictures of my first greenhouse.
I had debated over a few months on how to build this taking into account: budget, cover material (plastic sheet/poly twin wall/ poly corregated panel), and local climate ( central Texas we get hot summers and somewhat mild winter with rain mid 20[-3.5C] to 100[38C].
I also factored in how long i wanted the greenhouse in its location: I built a ciderblock base to level the 4x4 treated lumber but did not cement it in place.
please let me know if yall have any suggestions.
(also notice the amount of time it took me, only working weekends, measure by the vines in the garden)
started with a dry fit of the lumber and steel frame (need to move that peach tree!) added four 4x4 lumber piers inside the cinderblock foundation. secured them to the horizontal 4x4 base. decided on metal strapping to wrap the steel frame and secure the 2x4 lumber added all-weather tape to decrease risk in tearing the plastic added 2 layers of weed fabric and covered with limestone gravel used a combination of batten tape with bradnails/ pvc snap claps/ and wiggle wire to secure the plastic a view of the seed germination station/ need to shield from the sun some blooms during the trans
temps in the greenhouse have already reached into the 100s(~37C) have a venting schedule in place.
All that is need now is to install a door, mosquito netting for the roll up sides and build more benches for future plant . I will post updates soon.
thanks for viewing!
-lui
Here is a story in pictures of my first greenhouse.
I had debated over a few months on how to build this taking into account: budget, cover material (plastic sheet/poly twin wall/ poly corregated panel), and local climate ( central Texas we get hot summers and somewhat mild winter with rain mid 20[-3.5C] to 100[38C].
I also factored in how long i wanted the greenhouse in its location: I built a ciderblock base to level the 4x4 treated lumber but did not cement it in place.
please let me know if yall have any suggestions.
(also notice the amount of time it took me, only working weekends, measure by the vines in the garden)
started with a dry fit of the lumber and steel frame (need to move that peach tree!) added four 4x4 lumber piers inside the cinderblock foundation. secured them to the horizontal 4x4 base. decided on metal strapping to wrap the steel frame and secure the 2x4 lumber added all-weather tape to decrease risk in tearing the plastic added 2 layers of weed fabric and covered with limestone gravel used a combination of batten tape with bradnails/ pvc snap claps/ and wiggle wire to secure the plastic a view of the seed germination station/ need to shield from the sun some blooms during the trans
temps in the greenhouse have already reached into the 100s(~37C) have a venting schedule in place.
All that is need now is to install a door, mosquito netting for the roll up sides and build more benches for future plant . I will post updates soon.
thanks for viewing!
-lui